YOUR NEXT DISCOVERY/SpaceFollow your curiosity
Saturn Apollo Program
NASA / MSFC · Reuse terms

Space / 1964-11-01

Saturn Apollo Program

Saturn Apollo Program

NASA's image library records Saturn Apollo Program.

The Saturn I S-I stages for the SA-8 and SA-10 mission in final assembly phase in a manufacturing building at the Michoud Assembly Facility in New Orleans, Louisiana. The SA-8 mission was launched on May 25, 1965 with the first industry-built booster, and deployed the Pegasus II Micrometeoroid Detection satellite. The SA-10 mission was the last Sat

SERENDIPITYA little unexpected
FamiliarWeird

The Saturn I S-I stages for the SA-8 and SA-10 mission in final assembly phase in a manufacturing building at the Michoud Assembly Facility in New Orleans, Louisiana. The SA-8 mission was launched on May 25, 1965 with the first industry-built booster, and deployed the Pegasus II Micrometeoroid Detection satellite. The SA-10 mission was the last Saturn I mission, launched on July 30, 1965, and carried the Pegasus III Meteoroid Detection satellite.

Explore NASA's original image record for credits and available downloads.

NASA Image and Video LibrarySaturn Apollo Program

Original explanation based on the sources above. Images carry their own reuse terms.